Schapp Corporation keeps careful track of the time required to fill orders. The times recorded for a particular order appear below: Hours Move time 3.7 Wait time 11.5 Queue time 7.9 Process time 2.6 Inspection time 1.5 The throughput time was:

Respuesta :

Answer:

The throughput time was 15.7 Hours

Step-by-step explanation:

Consider the provided information.

A product formula's throughput time is determined by adding the manufacturing process's four steps: system time, inspection time, moving time, and wait time.

Throughput time = Process time + Inspection time + Move time + Queue time

Throughput time = 2.6 + 1.5 + 3.7 + 7.9

Throughput time = 15.7 Hours

Hence, the throughput time was 15.7 Hours